Komatsu PC4000 Hydraulic Mining Shovel Official General Assembly Procedure Manual
$30.00
196 in stock
Komatsu PC4000 Hydraulic Mining Shovel Official General Assembly Procedure Manual
The Best Ā PDF Manuals Online Includes : Bookmarks + Searchable Text + Index = Fast Navigation And Best Organization !Ā
This is the COMPLETE Official General Assembly Procedure Manual for the Komatsu Hydraulic Mining Shovel.
This manual describes how to assemble the units into the complete
machine.
It’s contains information and data to this model. has specs, diagrams, and actual real photo illustrations, and schemes.
This PDF file is Bookmarked and SEARCHABLE to make what you need easy to find.Ā
This General Assembly Procedure manual provides you with everything you need to know in order to assembly your machine safely and effectively. Step-by-step assembly procedure, parts installation, adjustment and maintenance procedure after completion of assembly.
Diagrams are provided with the listings to aid the service technician in identifying clearly the parts that need to be ordered.
Models And Serials :
Ā All Years & Serials CoveredĀ
CONTENTS :Ā
1. Overviews
1.1 SuperstructureĀ
1.2 Engine HouseĀ
2. General
2.1 Delivery of the ExcavatorĀ
2.2 Assembling of the ExcavatorĀ
2.3 Transportation and LiftingĀ
2.4 Manpower / Assembly TimeĀ
2.5 Assembly Site RequirementsĀ
2.6 Space and Placing RequirementsĀ
2.7 Preparation for AssemblyĀ
2.8 Basic Measurements and Weights
2.9 Transport Dimensions and WeightsĀ
3. Assembly sequence
3.1 Assembly of UndercarriageĀ
3.2Ā Assembly of Superstucure onto the Undercarriage
3.3 Assembly of engine house
3.4 Mounting of BoomĀ
3.5 Mounting of Hydraulic Oil TankĀ
3.6 Mounting of Hydraulic Oil CoolerĀ
3.7 Mounting of Fuel TankĀ
3.8 Mounting of Hydraulic access LadderĀ
3.9 Mounting of Cab BaseĀ
3.10 Mounting of CounterweightĀ
3.11 Mounting of Handrails, Steps and GratingsĀ
3.12 Mounting of CabĀ
3.13 Mounting of Bucket CylindersĀ
3.14 Filling of hydraulic tank and fuel tank
3.15 Mounting of Stick
3.16 Pre-checks prior Initial Start-up
3.17 Mounting of stick cylinders to the stick
3.18 Assembly of Bullclam Bucket to the Stick
3.19 Mounting of the Pin Seals
3.20 Connection of the cable harnesses to the terminal rails in the switch box “X2”
3.20 Putting the Central Lubrication System into operation
3.22 Standard Application Torque Chart
4. Appendix
Typical transport situations
Check Fire Electric Detection and Actuation System, Type SCN
Ā
Please Login To Download Attachment